Details: part of lt steel tubular pole 8/9 mtr. long: - excavation of earth in all kinds of soil for making pits of size 1.2x1x1x1 m suitable for installing stp 8/9 mtr long, of stp 8/9 meter long with rcc in the excavated pit, refilling of pit with excavated soil including watering and ramming etc. as required disposing off surplus soil at the dumping site of local bodies, fixing of m.s clamps , stay clamps, stay wire,m.s angel lt cross arms, insulators, nut & bolts including drilling,bending welding etc.as required, filling of rcc muffwith cement concrete in ratio 1:2:4 (1cement:2 sand :4 concrete 20mm nominal size) from bottom to top, painting of all steel parts and stp with two coats of aluminium paint a grade, fixing of any other item required to complete the job, as per standard practice of hpsebl and as per the direction of engineering in charges. carge of lt stay set :-excavation of earth in all kinds of soil for making stay pit of size 1.2x1x1, fixing of lt stay set, ,nozel
Sector: Distribution