Details: 40 mm injection moulded cap (qr / non qr)scope of work:the safety audit provides assurance that the existing safety framework/ managementcontrol ensures the compliance with safety and statutory requirements.the safety auditshould be conducted in terms of indian standard (is):14489:1998and other statutoryrequirements in various legislations, acts, rules, standards, code of practices, etc.the fire & safety risk areas/ system should be physically checked/ examined whether theprotection measures installed in the area/ system are operational/ healthy and adequate inreference to established statutory requirements in various legislations, acts, rules,standards, code of practices, etc.the scope of work includes all safety aspects of the power station and not limited to thefollowing:1. generator fire protection system.2. fire protection system for generator transformer & gis.3. fire protection system installed for cable and cable galleries & ventilation tunnel.4. fire protection system for batt
Sector: Research center