Description: Construction of Business Promotion Centre Inspection Hut Name of Work Construction of Business Promotion Centre Inspection Hut in BBT Corridor at Gondpur Teh Haroli Distt Una HP
Details: Excavation in earth work in all heights and depth in all kinds of soils, including saturated soil comprising of pick work, jumper work, and blasting work both in soft and hard rock with chiselling and wedging out of rock (where blasting is prohibited) and their intermediate classification of soils including, dewatering wherever required, setting out to required lines, levels as shown on the drawing and directed by the Engineer -in-Charge at site. according to the HP.PWD. specification Providing and laying cement concrete 1:4:8 (1 cement:4 sand:8 graded stone aggregate 20mm nominal size) and curing complete including cost of form work in:Foundation and plinth and wall etc. including carriage of materials upto all leads and lifts. Providing form work with steel plates 3.15 mm( three decimal fifteen millimeter ) thick welded with angle iron in frame of 30x30x5mm(thirty into thirty into five millimeter) so as to give a fair finish including centering shuttering strutting and pro
Sector: Industry Development