Description: Name of Work Restoration to road damages due to laying of OFC on link road NH21A to Haripur Sandholi km 0 0 to 1 00 P L Bituminous concrete interlock tiles on berms U shape drain Thermoplastic paint etc in km 0 0 to 0 200
Details: Earthwork in excavation for structures as per drawing and technical specifications Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excavated suitable material. including carriage of material labour and equipment within all leads and lifts as per the directions and entire satisfaction of Engineer-in -Charge providing and laying cement concrete 1:4:8 (one cement, four sand , eight graded crushed stone aggregate 40mm (forty millimeter) Nominal size ) and curing complete including mechanically mixing and vibrating excluding cost of frrm workincluding carriage of material with in all lead and as per the direction and entire satisfaction of Engineer-in charge. Plain/reinforced cement concrete in substructure complete as per drawings and technical specification clause 802,804,805,806 ,807,1202 and 1204 (1:3:6) ( 1 cement:3 co
Sector: PWD