Description: SH CO Supporting piller CO wire crate Dismantling re laying jointing testing of G I pipe 125mm dia Name of Work Restoration of rain damages to F I S Baragran in G P Baragran in Tehsil Manali Distt Kullu H P SH C O Supporting piller C O wire crate Dismantling re laying jointing testing of G I pipe 125mm dia Estimated cost Rs 1 38 214 Earnest Money Rs 2 764 Time 2 months
Details: Excavation in foundations, trenches etc.in all kind of soil in all leads and lifts such as pick work, jumper work in saturated/unsaturated soil including bailing out water, blasting work in hard/ soft rock or chiseling in hard/soft rock where blasting is prohibited in all lifts stacking the excavated earth not more than 3 mtrs clear from the edge of excavation and then returning the stacked soil in 15 cm layers when required into plinths sides of each deposited layer by ramming and watering and then disposing of all surplus excavated earth foundations etc., consolidating as directed within all leads and lifts and handing over the useable materials available from excavation to department free of cost to the entire staisfaction of Engineer-in-charge with in all leads and lifts. Providing and laying cement concrete 1:4:8 (1cement :4 sand :8 graded stone aggregate 20mm nominal size) and curing complete excluding the cost of form work in in foundation and plinth. Random rubble masonry/poly
Sector: Medical and Health