Details: providing , laying spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the material with water at omc in mechanical mixer (pug mill) carriage of mixed material by tipper to site, laying in uniform layers in sub-base/ base course on a well prepared sub-base and compacting with smooth wheel roller of 80 to 100kn (eighty to hundred kilo newton) capacity to achieve the desired density including lighting barricading and maintenance of diversion etc. as per tables 400.11 & 400.12 and technical specification clause 406. including carriage of material within all leads and lifts and other incidentials.the rate includes sale tax octori, royality,malkhana ,toll tax,gst,labour cess or other taxes imposed by the government.. providing and applying evenly a primer coat with bitumen emulsion (ss-1)on prepared surface of granular base including cleaning of road surface and spraying primer at the rate of 0.70-1.0 kg (zero point seventy kilogram to one
Sector: PWD