Details: supply and stacking at site of work graded stone crushed / broken aggregate of approved hard stone free from desintegrated pieces deleterious and organic matter and carriage of materials with in all leads and lifts and proper stacking in all respect as per direction of engineer-in-charge. the material will be stacked along side the road in proper stacks as per pwd specification. aggregate 10 mm ( ten millimetre) aggregate 20 mm ( ten millimetre) supplying and stacking at site of work coarse sand free of dust,dirt and other organic matter as per direction of the engineer - in - charge including loading un-loading and carriage of materials with in all leads and lifts and as per p.w.d. specification supplying and stacking at site of work dry hard fuel wood the fuel wood shall be dry and have a minimum girth of nine inch but not exceeding one feet six inch including entire carriage of material in all leds and lifts and proper stacking at site as per the direction of the engineer-in-cha
Sector: PWD