Details: earthwork in excavation for structures as per drawing and technical specifications clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50m(fifty metre) dressing of sides and bottom and backfilling in trenches with excavated suitable material ordinary soil upto 3m(three metre) depth as directed by engineer-in-charge all kinds of soil including entire carriage of material within all leads, lifts and other incidents.the rates are inclusive octrol, royality, malkana,toll tax, gst or other taxes imposed by the government. providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - all work up to plinth level 1:3:6 (one cement : three coarse sand : six graded stone aggregate 20 mm (twenty millimetre)as per the direction of engineer-in-charge including entire carriage of material within all leads and lifts and other incidents.the rates a
Sector: PWD