Details: excavation in foundation trenches etc. in all kinds of soil such as pick jumper work blasting soft or hard rock or by chiselling where blasting is prohibited soft/hard rock in all lifts stacking the excavated soil as directed by the engineer-in-charge clear from the edge of excavation and then returning the stacked soil in 15cm layers when required into plinth sides of foundation etc. consolidating each deposited layer by ramming and watering and then disposing of all surplus excavated earth as directed by the engineer-in-charge in all leads and lifts. providing and laying cement concrete 1:4:8 (one cement is to four sand is to eight graded stone aggregate 40 milimetre nominal size) and curing complete excluding the cost of form work in foundation and plinth complete in all respect in all leads and lifts as per the direction and entire to the satisfaction of engineer in charge . providing form work with steel plates 3.15 milimetre thick welded with angle iron in frame 30x30x5 milimet
Sector: Medical and Health