Description: SH C O R Wall NAME OF WORK CONSTRUCTION OF MOKSH DHAM SWARAG AASHRAM VEERBHADRA WARD NO 06 M C KANGRA SUB HEAD CONSTRUCTION OF RETAINING WALL DEPOSIT WORK
Details: Excavation in foundation, trenches etcetra in earth work in all kind of classification of soil such as pick work, jumper work, pick jumper work, blasting work, soft and hard blasting and doing work in saturated soil, including chiselling or wedging out rocks where blasting work is prohibited or any other mixed variety of soil including shoring, strutting, de-watering and pumping or bailing out water (surface and sub soil water) upto any depths any quantum of water including slush which may arise during de-watering or removal of slush, lift upto any height stacking the excavated soil not more than 3 metres (Three metres) clear from the edge of excavation and then returning the stacked soil in 15cm (Fifteen centimetre) layers, when required into plinths, sides of foundation etcetra consolidating each deposited layer by ramming, watering and then disposing of all surplus excavated earth as per specification, approved drawing design as per the entire satisfaction and direction of the Engin
Sector: PWD