Details: demolishing cement concrete manually/ by mechanical means including disposal of material within all lead as per direction of engineer-in-charge.nominal concrete 1:4:8 or richer mix (i/c equivalent design mix) earth work in excavation by mechanical means (hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 15 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift upto 1.5 m, as per direction of engineer in charge (i ) all kind of soil . providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - all work up to plinth level 1:2:4 (1 ement : 2 coarse sand) : 4 graded stone aggregate 20 mm nominal size) brick work with common burnt clay f.p.s. (non modular) bricks of class designation 7.5 in foundation and plinth in cement mortar 1:6 (1 cement : 6 coarse sand) complete within carriage of material in all leads and lifts. providing wood work in frames of false celling pa
Sector: PWD