Details: providing, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with smooth wheel roller 80-100 kn in stages to proper grade and camber, applying and brooming, stone screening to fill-up the interstices of coarse aggregate, watering and compacting to the required density grading 2 as per technical specification clause 405. including carriage of material with in all leads and lifts and other incidentals as per direction of engineer-in-charge..the rates includes octroi,royality ,malkana toll tax ,goods and serivice ,building and other construction workers, welfare cess, royality of any other tax, levy or cess in respect of input for or output by this contract shall be payable by the contractor and government shall not entertain any claim whatsoever in this respect of the same. providing and applying primer coat with bitumen emulsion (ss-1) on prepared surface of granular
Sector: PWD