Details: dismantling doors, windows and clerestory windows (steel or wood) shutter including chowkhats, architrave, holdfasts etc. complete and stacking second class teak wood, including carriage of materials through all modes of transportation with in all leads and lifts, as per pwd specifications and as per direction of the engineer-in-charge including all incidentals. the rates are inclusive of octroi, royaltiy, malkana, toll tax, gst or other taxes imposed by the government. dismantling tile work in floors and roofs laid in cement mortar including stacking material within all lead. for thickness of tiles 10mm (ten millimeter) to 25mm (twenty five millimeter) , including carriage of materials through all modes of transportation with in all leads and lifts, as per pwd specifications and as per direction of the engineer-in-charge including all incidentals. the rates are inclusive of octroi, royaltiy, malkana, toll tax, gst or other taxes imposed by the government. demolishing cement conc
Sector: PWD