Details: excavation in foundation, trenches etc. in earth work lift upto 1.50 metres stacking the excavated soil not more than 3 metres clear from the edge of excavation and then returning the stacked soil in 15cm layers, when required, into plinths, sides of foundations, etc consolidating each deposited layer by ramming and watering and then disposing of all surplus excavated earth as directed within a lead of 20 metres in pick jumper work. providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering all work up to plinth level 1:3:6 (1 cement: 3 coarse sand): 6 graded stone aggregate 40 mm nominal size) in all leads and lifts. supplying at site angle iron post & strut of required size including bottom to be split and bent at right angle in opposite direction for 10 cm length and drilling holes upto 10 mm dia. etc. complete. providing and fixing g.i. chain link fabric fencing of required width in mesh size 25 x 25 mm made of g.i.wire of dia
Sector: Medical and Health