Details: earthwork in excavation for structures as per drawing and technical specifications clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excavated suitable material. ordinary soil all lead and lift, carriage of material by manual, mechanical transport and mule and others incidental complete and rates including all taxes imposed by government. providing and laying of boulder apron laid in wire crates with 4 mm dia gi wire conforming to is:280 and is:4826 in 100 mm x 100 mm mesh (woven diagonally) including 10 per cent extra for laps and joints laid with stone boulders weighing not less than 25 kg each as per drawing and technical specifications clause 1301 all lead and lift, carriage of material by manual, mechanical transport and mule and others incidental complete and rates including all taxes imposed by government. constru
Sector: Urban Authority