Details: excavation in foundations, trenches etc, in earth work, lift upto 1.50mts. stacking the excavated soil not more tah 3 metres clear from the edge of excavation & returning the stacked soil in 15cm layers, when required into plinths sides of foundations etc conslidating each depositrd layer by ramming & watering & then disposing of all surplus excavated earth as directed within a lead of 20 meters as per the direction of e-in-charge. providing & laying cement concrete 1:4:8 (1 cement:4sand:8graded stone aggregate 40mm nominal size) and curing complete excluding cost of from work and reinforcement for reinforced concrete work in foundation footing bases of columns and the like and mass concrite as per direction of engineer in charge with in all leads & lifts. providing & laying cement concrete 1:2:4 (1 cement:2sand:4graded stone aggregate 20mm nominal size) and curing complete excluding cost of from work and reinforcement for reinforced concrete work in foundation footing bases of column
Sector: Medical and Health