Details: a) part part ts. no-200/2024-25 wbs no- 32100261-001-una-ht-125 of s.t single pole str. 9 mtr. long :- digging of pit fixing of insulator, disc and drilling of holes in x-arm , bracing set, top clamp, of pole, fixing of barbed wire and danger plate, filling of pit ,g.o. switch, alluminium paint and ramming & painting of poles complete in all respect. of s.t double pole str. 9 mtr. long :- digging of pit fixing of insulator, disc and drilling of holes in x-arm , bracing set, top clamp, of pole, fixing of barbed wire and danger plate, filling of pit ,g.o. switch, alluminium paint and ramming & painting of poles complete in all respect. (existing 1 pole + proposed 1 pole str. with go switch) stringing and sagging ht ab cable (3c+ messenger) size 70 mm2 to 185 mm2:- laying of ab cable, installation of suspension and tension assembly etc.,sagging of ab cable,heat shrinkable cable jointing/termination/t0joint (1 no. straight through+2 no. cable termination & 1 no t0 jointin
Sector: Distribution