Details: demolishing r.c.c. work manually/ by mechanical means including stacking of steel bars and disposal of unserviceable material within 50 metres lead as per direction of engineer-in-charge. demolition stone masonry above gl upto floor two level including stacking of serviceable materials and disposal of un-serviceable materials and disposal unserviceable materials with in 20 metres lead). excavation in foundation and trenches etc. (for pipes and pits upto all depths) in all kinds of soil such as pick work, jumper work, blasting and chiselling soft or hard rock where blasting is prohibited in all leads and lifts including trimming and dressing of sides, levelling of bed to correct grade stacking the excavated soil clear from the edge of excavation and returning the excavated soil after laying, jointing and testing of gl pipes in trenches in 15 cm layers including consolidating each deposited layers by ramming and watering and then disposing of all surplus excavated soil as directed in al
Sector: Medical and Health