Details: excavation in foundation trenches etc. in earth work, lift upto 1.50mts. stacking the excavated soil not more than 3 metre clear from the edge of excavation and then returning the stacked soil in 15 centimetre (fifteen centimetre)layer when required into plinth sides of foundation etc.consolidating each deposited layer by ramming and watering and then disposing of all surplus excavated earth as directed by the engineer-in-charge within all leads and lifts. providing and laying cement concrete 1:3:6 (one cement is to three sand is to six graded stone aggregate 40 milimetre nominal size) and curing complete excluding the cost of form work in foundation and plinth with in all leads and lifts as per the direction of engineer-in-charge. providing and laying cement concrete 1:1.5:3(one cement is to one and half sand is to three graded stone aggregate 20 milimetre nominal size) and curing complete excluding the cost of form work and reinforcement for reinforced concrete work in:-
Sector: Medical and Health