Details: excavation in foundation, trenches,etc. in earth work in all kinds of soil such as pick work,jumper work,blasting work, hard blasting and chiselling etc. stacking the excavated soil not more than 3 mtrs.clear from the edge of excavation and then returning the stacked soil in 15cm.layers when required into plinths sides of foundations etc. consolidating each deposited layer by ramming and watering and then disposing of all surplus excavated earth as directed within all leads and lifts.pick work 70% and jumper work 30%. cutting by electric welding of mserw/api pipe of various dia complete in all respect within all leads and lifts as per direction and entire satisfaction of engineer in charge. 300mm dia demolition above ground level upto floor two level including disposal of unserviceable material within 20 metres lead and including cutting the necessary reinforcement and separating from rcc/r.b. work. rcc block providing and fitting gaskets of red fiber and black metallic sheet of the
Sector: Water Resource Department