Description: Construction of HP PWD Division office and Sub Division office building at Paonta Sahib in Tehsil Paonta Sahib District Sirmour HP SH Geological Investigation of soil Strata Name of Work Construction of HP PWD Division office and Sub Division office building at Paonta Sahib in Tehsil Paonta Sahib District Sirmour HP SH Geological Investigation of soil Strata
Details: Sub Soil investigation in all type soil status by drilling bore holes of NX size75 (seventy five) microns diameters ranging from 10 (ten) metres or about in depth for investigation of soil/rock condition at site of work including mobilization and demobilization for drilling/shifting of machinery to bore site making plateform and water arrangement for drilling the scope of workincludes preservation of core including relevant test and submission of geological report of complex site of work including carriage of material within all leads and lifts and other incidentals and as per the directions of Engineer-In-Charge.
Sector: PWD