Details: removal of pump from foundation and shifting to workshop for repair including loading and unloading at both side. dismentaling of complete pump after heating with gas complete in all respect as per direction of engineer-in-charge. p/f de bearing skf make complete in all respect as per direction of engineer in charge p/f nd bearing skf make complete in all respectas per direction of engineer in charge p/f impeller complete in all respcet as per the direction of engineer-in-charge. p/f shaft of ss 410 material complete in all respect as per the direction of engineer in charge p/f neckring complete in all respect as per the direction of engineer in charge p/f gland sleeves complte in all respect as per the direction of engineer in charge p/f of o rings, gasket kit, locknut, gland plate complte in all respect as per the direction of engineer in charge alignment and testing of motor on no load and with pump on full load condition including cable connection and commissioning of motor at sit
Sector: Water Resource Department