Details: earthwork in excavation in all kinds classification of soil in foundation of structures upto all depth/ height as per drawing and technical specification clause 305.1 includding setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto all lead and lifts dressing of sides and bottom and back filling with approved material and disposal of all surplus excavated earth in specified site and direction of engineer-in-charge complete. providing and laying of boulder apron laid in wire crates with 4mm dia gi wire conforming to is:280 and is:4826 in 100mm x 100 mm (one hundred milimeter into one hundred milimeter) mesh (woven diagonally) including 10 percent (ten percent) extra for laps and joints laid with stone boulders weighing not less than 25 kg (twenty five kilogramme) each as per drawing and technical specifications clause 1301 including carriage of materials within all leads and lifts and direction of engineer-in-charge.
Sector: PWD