Details: excavation in earth work and disposal of all excavated earth upto any lead and lift upto 1.50 metres, disposed earth to be levelled and neatly dressed in pick, jumper work including entire carriage of material within all leads & lifts. excavation in foundations, trenches etc.in earth work in all kind of soil such as pick work, jumper work including chiseling/wedging work in dry or saturated conditions up to any depth including stacking the excavated soil serviceable and unserviceable materials separately and then in fifteen centimeters layers when required into plinth side of foundation etc. consolidating each deposited layer by ramming and watering and then disposing of all surplus excavated soil, unserviceable material and stacking the serviceable materials as directed by the engineer-in-charge within all leads & lifts and disposed materials to be neatly leveled. providing and laying cement concrete 1:6:12(1cement:6sand:12 graded crushed stone aggregate 40mm.nominal size) and curing
Sector: School