Details: excavation in foundation and trenches etc. in all kind of soil such as pick work,jumper work,blasting in soft/hard rock chiseling where blasting in prohibited, soft/hard rock saturated soil including dewatering stacking the excavated soil with in all leads and lifts clear from the edge of excavations and then returning the stacked soil in 15cm layers when required into plinths sides of foundation etc. consolidating each deposited layer by ramming and watering and then disposing of all surplus excavated earth as directed within all leads and lifts complete in all respect and as directed by the engineer- in-charge providing and laying cement concrete 1:3:6 ( one cement : three sand : six graded stone aggregate 40 mm nominal size )and curing complete excluding cost of form work in foundation and plinth in all depths and to the entire satisfaction of the engineer in charge. providing and laying cement concrete 1:1.5:3 (1 cement: 1.5 sand: 3 graded stone aggregate 20 mm nominal size)an
Sector: Medical and Health