Details: earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with approved material. providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - all work up to plinth level : 1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 40 mm nominal size) back filling behind abutment, wing wall and return wall complete as per drawings and technical specification clause 1204.3.8. granular material. providing weep holes in brick masonry/ stone masonry/ plain reinforced concrete abutments wing wall, return wall with 100mm pvc pipe extending through the full width of the structure with of i (v) : 20 (h) towards drawing face complete as per drawing and technical specifications clause 614, 709, 1203.3.7 as per direction of engineer-in-charge includin
Sector: Urban Authority