Details: earth work in excavation for structures as per drawing and technical specifications clause 305.1 including setting out. construction of shoring and bracing, removal of stumps and other deleterious material and disposal up to a lead of 50mtr dressing of sides and bottom and back filling in trenches with excavated suitable material and as per the direction and entire satisfactions of engineer -in -charge including the cost of form work and curing complete, including carriage of materials within all leads, lifts and other incidentals. the rate including octroi, royality, malkana, toll tax, sale tax g s t or other taxes imposed by the government. providing and laying concrete 1:4:8 (one cement: four sand eight: graded stone aggrigate) for plain/reinforced concrete in open foundations complete as per drawing and technical specification clauses 802, 803, 1202 and 1203as per the direction and entire satisfactions of engineer -in -charge including the cost of form work and curing
Sector: PWD