Details: earthwork in excavation for structures as per drawing and technical specifications clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excavated suitable material.(ordinary rock and hard rock) as per direction of engineer-in-charge. including carriage of materials within all leads and lifts and other incidental.the rate is including octroi, royality, gst, toll tax, sale tax or other taxes imposed by the government. providing concrete for plain/reinforced concrete in open foundations complete as per drawings and technical specifications clause 802, 803, 1202 & 1203 (p.c.c m-10- 1:3:6 as per direction of engineer-in-charge. including carriage of materials within all leads and lifts and other incidental.the rate is including octroi, royality, gst, toll tax, sale tax or other taxes imposed by the government. providing concret
Sector: PWD