Details: excavation in foundations, trenches etc., in earth work, iift upto 1.50 mts. stacking the excavated soil not more then 3 mts. clear from the edge of the excavation & then retur- ning the stacked soil in 15 cms. layers, when required into plinths sides of foundation etc., consolidating each deposited layers by ramming and watering & then disposing of all surplus excavated earth as dienected within all lead of 20 mtrs in pick and jumper work 50% each. providing and laying cement concrete 1:4:8(1cement:4sand:8 approved quarry stone aggregate 40mm nominal size) and curing complete excluding cost of form work in foundation and plinth.including carriage of material upto all leads and lifts.. providing & laying cement concrete1:1.5:3 (1 cement:1.5 sand: 3 graded stone aggregate 20 mm nominal size) & curing complete excluding the cost of form work including carriage of material upto all leads and lifts. flat surlaces such as soffitts of suspended floors etc. vertical surfaces such as wall of
Sector: Medical and Health