Details: earthwork in excavation in all heights and depths in all kinds of soils for structure as per drawing and technical specifications clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal all leads dressing of sides and bottom and backfilling in trenches with excavated suitable material. including carriage of all labour equipment and material to various location through all modes of transportation in all leads and lifts, including all incidental charges. providing and laying of boulder apron laid in wire crates with 4 mm dia gi wire conforming to is:280 and is:4826 in 100 mm x 100 mm mesh (woven diagonally) including 10 per cent extra for laps and joints laid with stone boulders weighing not less than 25 kg each as per drawing and technical specifications clause 1301, including carriage of material in all leads and lifts as per the direction of the engineer- in- charge. providing and laying of boulder apron
Sector: PWD