Description: Providing and Laying 30 mm thick Bitumen concrete at HMP in various Roads Bilaspur Name of Work Repair and Maintenance of Various road under Bilaspur Sub Division No III SH Providing and Laying 30 mm thick Bitumen concrete at HMP in various Roads Bilaspur Sub Division No III
Details: Providing and laying bituminous concrete 30 mm (Thirty milimrtre) thick with 100-120 TPH batch type hot mix plant producing an average output of 75 tonnes per hour using crushed aggregates of specified grading, premixed with bituminous binder VG-30 @ (viscosity grade thirty)5.5% (Five point Five per cent) of mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MORTH specification clause No. 507 complete in all respects. including carriage of materials within all leads lifts and other incidentals as per direction of Engineer-in-Charge. The rate includes, octroi, Malkhana , Toll tax , Goods Service Tax, building and other constrcution worker, welfare cess, royalty or any other tax, leavy or cess in respect of input for or output by this contract shall be payable by the contrac
Sector: PWD