Details: earth work in excavation by mechanical means (hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift upto 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m. by engineer-in-charge(all kind of soil)including all lead and lift. providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - all work up to plinth level 1:2:4 (1 cement : 2 fine sand : 4 graded stone aggregate 20 mm nominal size) providing and fixing chlorinated polyvinyl chloride (cpvc) pipes, having thermal stability for hot & cold water supply including all cpvc plain & brass threaded fittings this includes jointing of pipes & fittings with one step cpvc solvent cement, trenching, refilling & testing of joints complete as per direction of engineer in charge. 100 mm nominal inner d
Sector: Urban Authority