Details: earth work in excavation for structure as per drawing and technical specification clause 305.1 including setting out construction for shoring and bracing removal of stemps and other deleterious materials and disposal upto lead any meter dressing of side and bottom and back filling in trenches with excavated suitable material ordinary soil upto any depth or as per direction of engineer-in-charge including carriage of material within all leads, lifts and other incidentals. providing and laying concrete for plain/rainforcement concrete 1:4:8 (one cement : eight sand : eight graded stone aggregae) in open foundation complete as per drawing and technical specification clauses 802, 803, 1202 and 1203 or as per direction of engineer-in-charge including carriage of material within all leads, lifts and other incidentals. providing weepholes in bricks masonry/stone masonry plain/reinforced complete abutment wing wall, return wall with 100 mm (one hundred millimeter) dia pvc pipe extending thro
Sector: PWD