Details: manual carriage of material for 1km ht line average distance from road head to site of work (average lead=0.5km) steel tubular poles 9m long with stay set i/c stay wire of ht line of steel tublar poles (single pole 9mtr. long) digging of pit of pole filling of pit +ramming drilling of hole in poles, x-arms fixing of insulator , x-arms, knee bracing set, top clamp etc. providing paint & painting one priming coat with ready mixed priming paint brushing red lead/zinc oxide chrome painting two coats with alluminium paint of superior quality i/c all type of lead and lift and other incidentals complete in all respect ( single steel tubular pole) and fittings filling of rcc with cement concrete 1:3:6 (1 cement:3 sand : 6 aggregate 20 mm nomial size) curing complete & placing of templets etc. complete job as per standard specification of hpsebl as per direction of site engineer. straightening of ht tilted pole single pole 9 mtr long double pole str 9 mtr long dismantlement o
Sector: Distribution