Details: excavation in foundation and trenches etc. in earth work in all kinds of soil such as pick work, jumper work, blasting soft or hard rock or by chiselling soft or hard rock where blasting is prohibited in all leads and lifts including trimming / dressing of sides and bed, stacking the excavated soil clear from the edge of excavation and returning the excavated soil after completion of work in 15cm layers when required into plinth, sides of foundation etc. consolidating each deposited layers by ramming and watering and then disposing of all surplus excavated soil complete in all respect as per direction and to the entire satisfaction of the engineer-in-charge. providing and laying cement concrete 1:4:8 (1cement: 4sand: 8 graded stone agg.40mm nominal size) and curing complete excluding cost of centering and shuttering including all leads and lifts. a) foundation and plinth. providing and laying cement concrete 1:2:4 ( 1cement: 2 sand:4 graded stone aggregate 20 mm nominal size) and cur
Sector: Medical and Health