Details: centering and shuttering including strutting, propping etc. and removal of form for :suspended floors, roofs, landings, balconiesand access platform as per drawing and h.p.p.w.d technical specifications all lead and lifts and carriage of material as directed by the engineer-in-charge centering and shuttering including strutting, proppingetc. and removal of form fo columns, pillars, piers, abutments, posts and struts(c) colums as per drawing and h.p.p.w.d technical specifications all lead and lifts and carriage of material as directed by the engineer-in-charge reinforced cement concrete work in beams, suspendedfloors, roofs having up to 15° landings, balconies,shelves, chajjas, lintels, bands, plain window sills,staircases and spiral stair cases above plinth level up tofloor five level, excluding the cost of centering,shuttering, finishing and reinforcement with 1:1.5:3 (1cement : 1.5 coarse sand) : 3 graded stone aggregate20 mm nominal size). as per drawing and h.p.p.w.d technical
Sector: Urban Authority