Details: demolishing brick work manually/ by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of engineer-in-charge in cement mortar including carriage of material within all leads and lifts and other incidentals. including hauling of material in all leads and lifts as per the entire satisfaction and direction of engineer-in-charge. earth work in excavation for structures as per drawing and technical specifications clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto all leads , dressing of sides and bottom and back filling in trenches with excavated suitable material in ordinary soil upto all depth. as directed by the engineer-in-charge.all useful material such as stone, shingle, aggregates& slate etc. shall be sorted out and stacked along the road side properly. any loss to the public and private property to during