Details: loosening of ground (compacting orignal ground suporting subgrade) loosening of the ground up to a level of 250 mm below the sub-grade level, watred graded and compacted in layers to meet requirement of table 300-2 for sub-grade construction, any loss to public/private property during course of excavation shall be the whole resposibility of the contractor including carrige of material and equipment in all leads and lifts by all modes of transportation as per the direction by the engineer-in-charg providing laying and compacting wmm (wet mix macadam ) 250 mm thick ) laying and compacting graded stone aggregate to wet mix macadam including premix the material with water at omc in mechanical mix plant carriage of mixed material by tipper to the site laying in uniform layesrs with graded in sub base /base course on well prepared surface and compecting with vidratory rooler to achive the desire density. in all leads and lifts by all modes of transportation as per the direction by the engi
Sector: PWD