Details: excavation in foundation trenches etc. in earth work lift up to 1.5 mtrs. stacking the excavated soil not more than 3 metres away from the edge of excavation and then returning the stacked soil in 15 cm layers when required in to plinth and sides of foundations, consolidating each deposited layer by ramming , watering and then disposing of all surplus excavated earth as directed with in a lead of 20 metres in pick jumper work. providing and laying cement concrete 1:3:6 (1 cement: 3 sand: 6 graded crushed stone aggregate 40mm nominal size) and curing complete excluding cost of form work in foundation and plinth work in all leads lifts as per the entire satisfaction & direction of the engineer -in- charge providing and laying cement concrete work 1:1.5:3 (1cement :1.5 sand: 3 graded crushed stone aggregate 20 mm nominal size) and curing complete excluding cost of form work and reinforcement for reinforced concrete work with in all leads and lifts as per the entire satisfaction & direct
Sector: Medical and Health