Details: dismantling roofing including ridges,hips, valleys, gutters, g.s. sheet etcetra stacking the serviceable materials and disposal of un-serviceable materials within all leads and lifts complete and stacking them including entire carriage of materials within all leads and lifts and as per drawings and technical specifications as per the direction of engineer-in-charge including all incidentals. the rates are inclusive of octroi, royality, malkana, toll tax, sale tax, gst or other taxes imposed by the government. repair to plaster of thickness 12mm to 20mm (twelve millimetre to twenty millimetre) in patches of area 2.50 sqm (two point five zero square metre) and under including cutting the patch in proper shape, raking out joints and preparing and plastering the surface of the walls complete, including disposal of to the dumping ground with cement mortar 1:4 (one cement : four fine sand) complete including entire carriage of material with in all leads, lifts, drawings, technical specifi
Sector: PWD