Details: demolishing cement concrete manually/ by mechanical means including disposal of material within 50 metres lead as per direction of engineer - in - charge. nominal concrete 1:3:6 or richer mix (i/c equivalent design mix) earth work in excavation by mechanical means (hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sq.m on plan), including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 mt. in all kinds of soil. providing and laying pvc pipes 150 mm dia. 4.00 kg/cmsq. working presseure isi marked with socket jointed complete including testing of joints etc. complete: providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - all work up to plinth level:1:3:6 (1 cement: 3 coarse: 6 sand) graded stone aggregate 20 mm nominal size) providing and laying in
Sector: Urban Authority