Details: site development and protection work (retaining & wall) clearing jungle including uprooting of rank vegetation, grass, brush wood, trees and saplings of girth up to 30 cm measured at a height of 1 m above ground level and removal of up to a distance of 50 m outside the periphery of the area cleared. earth work in excavation by mechanical means (hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift upto 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m.all kinds of soil. centering and shuttering including strutting, propping etc. and removal of form for all heights : foundations, footings, bases of columns,etc. for mass concrete providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - all work up to plinth level. 1:3:6 (1 cement :
Sector: Distribution