Details: excavation in soil in hilly areas by manual means including cutting and trimming of side slopes and disposing of excavated earth with a lift upto 1.5m and a lead upto 20m as per drgs and tech specs. earthwork in excavation for structures as per drawing and technical specifications clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a any lead and lift , dressing of sides and bottom and backfilling in trenches with excavated suitable material.useful material available from excavation to be properly stacked and handed over to the department free of cost including all leads and lifts, as per hppwd, specification of 1990 volume-i or as directed by the engineer-in-charge providing and laying concrete concrete 1:3:6 (1cement: 3 sand: 6 graded stone aggregate 20mm nominal size)for plain/reinforced concrete in foundation & plinth excluding the cost of form work open foundations complete as per drawing
Sector: PWD