Details: excatation in soil in hilly area in all depths using manual means as per drawing and technical specification ministry of rural development for rural roads august 2004 (two thousands four) clause 305.1 (three hundred five point one) including setting out, coustruction of shoring and bracing, removal of stumps and other deleterious materials including dressing of sides and bottom and back filling in trenches with excavated suitable materials and stacking of materials useful for construction at suitable sites and safe disposal of unsuitable cut materials by all modes of transportations in all leads and lifts at specified places in specified manner, systematically with level consideration to avoiding a diverse effects on environment, trimming filling of uneverness blind age and finishing of the road to specified dimension or as directed by the engineer-in-charge. any loss to the public or private property during the course of excavation shall be the whole responsibility of the contractor w
Sector: PWD