Details: earth work in excavation for all type of road structure such as retaining walls, walls, culverts and drains etc. in all type of classification of soil comprising of ordinary soil, ordinary rock, hard rock, chiselling/wedging out rocks( where blasting is prohibited ) as per drawings and m.o.r.d 2014 technical specification clause 305 and as per direction of the engineer-in-charge including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto all leads and lifts including dressing of sides, bottom and back filling in trenches with excavated suitable approved material to the original surface in layers not exceeding 150mm ( one hundred fifty milimeters) compacted thickness including shoring and strutting and pumping and bailing out water ( surface and sub soil water ) upto any depth and any quantum of water including cleaning of slush which may arise out during dewatering as per the direction of the engineer-in-charge inclu
Sector: PWD