Details: earth work in excavation for structures as per drawing and technical specifications clause 305.1 including setting out, any dressing removal of stumps and other deleterious material and disposal upto any lead of 50 mtr (fifty metre) and lift complete including dressing of sides and bottom and backfilling in trenches with excavated material in ordinary soil within all leads and lift of materials and as per direction of engineer-in-charge. random rubble stone masonry work in cement mortar for sub structure complete as per drawing and technical specifications clause 702,704,1202 and 1204 random rubble masonry in cement mortar 1:6 (one cement : six sand ) random rubble masonry within all leads and lift including carriage of materials and as per direction of engineer-in- charge. construction of dry ruble masonry for retaining walls, walls, revetment walls and parapets etc. for sub structure and super structure complete as per drawing and technical specification clause 704.6 & 1302.5 in
Sector: PWD