Details: earth work in excavation for structures as per drawing and technical specifications clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto all leads , dressing of sides and bottom and back filling in trenches with excavated suitable material in ordinary soil upto all depth. as directed by the engineer-in-charge.all useful material such as stone, shingle, aggregates& slate etc. shall be sorted out and stacked along the road side properly. any loss to the public and private property to during the course of execution shall be the absoulte responsibility of the contractor which shall have to be duly compensated by him in all cases. providing concrete for plain/reinforced concrete in open foundation complete as per drawing & technical specification clause 802,803,1202 & 1203 pcc grade m-15 nominal min (1:2.5:5) hand mixed) including the cost of form work and hauling of material in all leads and lifts as
Sector: PWD