Details: civil work excavation work by mechanical means (hydraulicexcavator)/ manual means in foundation trenches ordrains (not exceeding 1.5m in width or 10 sqm on plan),including dressing of sides and ramming of bottoms, liftupto 1.5 m, including getting out the excavated soil anddisposal of surplus excavated soils as directed, within alead of 50 m. stone soling properly hand-packed filling interstices with kharanja stone to the requested gradient and comber including spreading watering and rolling of binding materials moorum or earth etc. complete as per hp.pwd specification. centering and shuttering including strutting, propping etc. and removal of form work for :retaining walls, return walls, walls (any thickness) including attached pilasters, buttresses, plinth and string courses fillets, kerbs and steps etc (i/c all leads and lifts) providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - all work up to plinth level 1:5:10 (1
Sector: Urban Authority