Details: providing, laying and rolling of built-up spray grout layer over prepared base consisting of a one layer composite construction of crushed coarse aggregates using motor grader for aggregates. key stone chips spreader may be used with application of bituminous binder after each layer, and with key aggregates placed on top of the single layer to serve as a base, conforming to the line, grades and cross-section specified, the compacted layer thickness being 75mm (seventy five millimetre) as per technical specification clause 505 as per direction of engineer-in-charge including carriage of materials within all leads and lifts and other incidental. the rate inclusive of octroi, royality, malkana, toll tax, sale tax or other taxes imposed by the government and rectifying defects noticed within two years as per clause 35 (iii) of standard bidding document. providing and applying tack coat with bitumen emulsion (rs-1) using emulsion distributor at the rate of 0.20 (zero decimal two zero
Sector: PWD