Details: demolishing rcc work manually/by mechanical means including stacking of steel bars and disposal of unserviceable material within all lead and lifts asper direction of engineer-in-charge demolishing stone rubble masonry built in cement mortar manually/by mechanical means including stacking of serviceable mateial and disposal ofunserviceable material within all lead and lifts as per direction of engineer-in-charge earth work in excavation by mechanical means(hydraulic excavator/manual means in foundation, trenches or drains (not exceeding 1.5 mtr in with or 10 sqm on plan, including dressing of sides and ramming of bottoms, lift upto 1.5m, including getting out excavated soil and disposal of surplus excavated soil as directed, within all lead and lift , any kind of soil. providing and laying in position cement concrete of grade 1:5:10 (1 cement :5 coarse sand: 10 stone aggregate 40mm nominal size) excluding cost ofcenering and shuttering - all work upto plinth level. providing and laying
Sector: Urban Authority